MES and OEE
Overall equipment efficiency on each line, for the operations team during the shift. Set up by the Cairo office, and still there after the line is running.
From the Cairo office
The shift, on one board
MES at Track is the system that measures overall equipment efficiency on the line, while the shift is still running. The operations team sees the line now, not in a spreadsheet after the shift has closed.
Printers, scanners, and vision already on the line are what feed the numbers. The board is how the shift reads them.
On this page
Start here
Why it is on the line
What the operations team gets
A live view of the lines, boards the plant can set for itself, and a connection to the systems already running the order. Decisions in the current shift, a clear look at where time is being lost, and fewer defects left inside the count.

Measure
OEE on the line
Overall equipment efficiency is calculated for each line, not reconstructed after the shift from notes.

Watch
The shift, as it happens
The team sees which lines are running and which are stopped, in time to act on this shift.

Read
Boards the plant can set
Dashboards are set for the way that plant already talks about a line, a day, and a stoppage.

Connect
Beside what already runs the order
The board sits with the systems already on the site. It does not ask the plant to start the order a second time.
The board
What a line shows
Each line shows overall equipment efficiency, split into availability, performance, and quality, whether that line is running, and how the hours of the day went. The range can be today, yesterday, the week, the month, or the full history.
The board below is a sample view. The percentages on it are not a result from a named plant.

Availability
Time the line could run
The share of the planned window in which the line was able to run. Stops show up here.
Performance
Rate against the set rate
How the running time compared with the rate the line is set for. A slow hour shows up here.
Quality
Good units in the count
Good units against the total count. Defects that still got into the count show up here.
Where it sits
Plants we put this on
Pharmaceutical lines, where the shift also has to hold compliance and batch traceability. Food and beverage. Electronics. Automotive.
Next step
Talk to the Cairo office
Tell us which lines should be on the board. The Cairo office will connect the shift view to the line you already run.
Office
Track Int’l Trade
Central Plateau, Seventh District
Salah El Din Street, Plot No. 8232
El Mokattam, Cairo

